Do You Have A Fire Damper Project? We Can Help!

Get a free quote

Fire Damper Installation

Productive Air team assist in the installation of fire dampers and volume control dampers so that they can be certified in accordance to all Australian standards including:

  • AS1668.1.2012
  • AS 1682 Part 1 & 2. 1991 and
  • For maintenance of fire dampers AS1851.6
Has your fire damper been checked and Certified?

Are any special installation requirements that you should be aware of? Yes!

  • Is the access panel clearly accessible, access is not blocked.

  • Other services running though the wall maintains minimum clearances to fire dampers, cables no closer than 50 mm, pipes no closer than 200 mm.

  • There are no other services running through the same hole,

  • The fire damper labelled
  • Is there a breakaway joint (RW Standard we want to see plastic nuts, bolts and clips)
  • There are no other services running through the same hole,
  • Is there an access panel fitted and is a suitable size

  • Slab mounted fire dampers duct above and below the damper is insulated for minimum 1000mm These are basic simple things to be aware of. More detailed checklist items are covered in following slides

  • There are no obvious gaps around the fire damper
  • Fixing flanges are fitted flat to the wall no gaps
Fire Damper Installation

Get A Quote Today

    FIRST NAME *
    LAST NAME *
    EMAIL ADDRESS *
    PHONE NUMBER *

    SUBJECT

    HOW CAN WE HELP?

    QUOTE REQUIRED BY